External Render – Clifton Place, Mutley Plain

project description

Problem

The existing render on this property in Clifton Place, Mutley Plain had deteriorated over time and needed full removal. The surface had lost its integrity and was no longer providing reliable weather protection or visual appeal. 

Solution

Done Right fully removed the old render from the exterior, taking it back to the original substrate. The team then applied two base coats with reinforcing mesh to create a strong, stable surface. Once prepared, the walls were finished with a 1.5mm SAS silicone render in Atlantic, delivering a durable and consistent finish. 

Outcome

Done Right completed the project to our professional standard, leaving the property with a fresh, long-lasting exterior. The new render not only enhances the appearance of the building but also provides improved weather resistance and crack protection. 

 Find out more about our professional Silicone Rendering services 

Project Details

Full removal of existing render, Substrate preparation, Reinforced base coat application, Silicone render finish, Final detailing and weatherproofing

April 2025

SAS 1.5mm Silicone Render (Atlantic), Reinforcing mesh, Two-coat base render system

Project Overview Video

Project Gallery